Calculation of Cost Estimation Based on Building Information Modeling in Construction Projects
DOI:
https://doi.org/10.23887/ijnse.v7i1.57640Keywords:
BIM, Revit, Cost EstimatingAbstract
BIM (Building Information Modeling) is currently a concept that can include important information in planning. This study aims Kosmetika Global Helath Indonesia, Ejip Area, Cikarang. In this research, 3D modeling of steel structures was carried out based on shop drawing documents from the research location. Next, calculate the quantity take-off for the estimated cost of steel structure work using Autodesk Revit software. It can be concluded that using Auusingit software can optimize the 2D modeling process into the 3D form so that the quantity take-off calculations can be more detailed and accurate and reduce material waste. It also already supports BIM 5D to help calculate estimated costs. The results of calculating estimated costs using Autodesk Revit software are 3.45% smaller than conventional calculations. It is because conventional methods are calculated manually based on 2D images, which allow for differences due to lack of detail.
References
Agustapraja, H. R., & Affandy, N. A. (2017). Perbandingan Estimasi Anggaran Biaya Dengan Metode Sni Dan Bow Pada Proyek Pembangunan Gedung D Fakultas Agama Islam Universitas Islam Lamongan. U Karst, 1(2), 84–93. https://doi.org/10.30737/u karst.v1i2.263. DOI: https://doi.org/10.30737/ukarst.v1i2.263
Anjani, A., Bayzoni, B., Husni, H. R., & Niken, C. (2022). Penerapan Building Information Modeling (BIM) Menggunakan Software Autodesk Revit Pada Gedung 4 Rumah Sakit Pendidikan Peguruan Tinggi Negeri (RSPTN) Universitas Lampung. Jurnal Rekayasa Sipil Dan Desain (JRSDD), 10(1). Retrieved from http://journal.eng.unila.ac.id/index.php/jrsdd/article/view/2360.
Danny Laorent, Nugraha, P., & Budiman, J. (2019). Analisa Quantity Take-Off Dengan Menggunakan Autodesk Revit. Dimensi Utama Teknik Sipil, 6(1). https://doi.org/10.9744/duts.6.1.1-8.
Dewi, A. A. D. P., Yana, A. A. G. A., & Susilawati, N. K. (2019). Analisis Faktor Yang Mempengaruhi Terjadinya Kerugian Negara Pada Tahap Pengadaan Pekerjaan Jasa Konstruksi. Jurnal Ilmiah Teknik Sipil, 23(2). https://doi.org/10.24843/JITS.2019.v23.i02.p04.
Haider. (2020). Cost Comparison of a Building Project by Manual and BIM. Civil Engineering Journal, 6(1). https://doi.org/10.28991/cej-2020- 03091451. DOI: https://doi.org/10.28991/cej-2020-03091451
Husin, A. E., Sihombing, S. A., Kussumardianadewi, B. D., & Rahmawati, D. I. (2020). Improving The Cost Performance of Mechanical Electrical And Plumbing (MEP) Works Buildings In Hotel Based on Building Information Modeling (BIM) 5D. CSID; Journal of Infrastructure Development, 3(2). https://doi.org/10.32783/csid-jid.v3i2.168. DOI: https://doi.org/10.32783/csid-jid.v3i2.168
Jawat, I. W., & Suwitanujaya, I. N. (2018). Estimasi Biaya Pencegahan Dan Pengawasan K3 Pada Proyek Konstruksi. Paduraksa: Jurnal Teknik Sipil Universtas Warmadewa, 7(1), 88–101. https://doi.org/10.22225/pd.7.1.820.88-101.
Khamistan. (2018). Analisis Estimasi Biaya Dengan Metode Cost Significant Model Sebagai Dasar Perhitungan Konstruksi Jembatan Beton Bertulang Di Kabupaten Aceh Tamiang. Teras Jurnal: Jurnal Teknik Sipil, 8(2). https://doi.org/10.29103/tj.v8i2.168 DOI: https://doi.org/10.29103/tj.v8i2.168
Laorent, D. (2019). Analisa Quantity Take-off dengan Menggunakan Autodesk Revit. Jurnal Dimensi Utama Teknik Sipil, 6(1). https://doi.org/10.9744/duts.6.1.1-8. DOI: https://doi.org/10.9744/duts.6.1.1-8
Liman, G. L., Adianto, Y. L. D., & Wimala, M. (2020). Implementasi Manajemen Fasilitas Konstruksi Sementara Pada Proyek Pembangunan Rumah Sakit Edelweiss Di Kota Bandung. Teras Jurnal: Jurnal Teknik Sipil, 10(2). https://doi.org/10.29103/tj.v10i2.295. DOI: https://doi.org/10.29103/tj.v10i2.295
M. N, U., Wang, Q., Wei, H. H., Chi, H. L., & Ni, M. (2021). Building information modeling (BIM), System dynamics (SD), and Agent-based modeling (ABM): Towards an integrated approach. Ain Shams Engineering Journal, 12(4), 4261–4274. https://doi.org/10.1016/j.asej.2021.04.015. DOI: https://doi.org/10.1016/j.asej.2021.04.015
Mardhani, R. I., Ratnaningsih, A., & Arifin, S. (2022). Perencanaan Ulang Anggaran Biaya Dan Waktu Pelaksanaan Gedung Perkuliahan Dengan Menggunakan Metode Bim. Rekayasa Sipil, 16(2). https://doi.org/10.21776/ub.rekayasasipil.2022.016.02.3. DOI: https://doi.org/10.21776/ub.rekayasasipil.2022.016.02.3
Marizan, Y. (2019). Studi Literatur Tentang Penggunaan Software Autodesk Revit Studi Kasus Perencanaan Puskesmas Sukajadi Kota Prabumulih. Jurnal Ilmiah Bering’s, 6(1). https://doi.org/10.36050/berings.v6i01.154. DOI: https://doi.org/10.36050/berings.v6i01.154
Muhammad, & Yunus. (2020). Analisa Perbandingan Biaya Pembuatan Pelat Beton Sistem Konvensional Dengan Sistem Boundeck Pada Pembangunan Gedung Kuliah Bersama Politeknik Negeri Fakfak. Teras Jurnal: Jurnal Teknik Sipil, 10(2). https://doi.org/10.29103/tj.v10i2.286. DOI: https://doi.org/10.29103/tj.v10i2.286
Novita, R. D., & Pangestuti, E. K. (2021). Analisa Quantity Take Off Dan Rencana Anggaran Biaya Dengan Metode Building Information Modeling (BIM) Menggunakan Software Autodeks Revit 2019 (Studi Kasus: Gedung LP3 Universitas Negeri Semarang). Dinamika Teknik Sipil, 14(1). https://doi.org/10.23917/dts.v14i1.15276. DOI: https://doi.org/10.23917/dts.v14i1.15276
P, C. A. B., Adhi, R. P., Hidayat, A., & Nugroho, H. (2016). Perbandingan Efisiensi Waktu, Biaya, Dan Sumber Daya Manusia Antara Metode Building Information Modelling (Bim) Dan Konvensional (Studi Kasus: Perencanaan Gedung 20 Lantai). Jurnal Karya Teknik Sipil, 5(2), 220–229. Retrieved from https://ejournal3.undip.ac.id/index.php/jkts/article/view/12641.
Pratama, A. F., & Witjaksana, B. (2022). Implementasi Autodesk Revit Untuk Quantiiy Take Off Pada Pekerjaan Struktur Jembatan. Jurnal Kacapuri : Jurnal Keilmuan Teknik Sipil, 5(1). https://doi.org/10.31602/jk.v5i1.7603. DOI: https://doi.org/10.31602/jk.v5i1.7603
Pratiwi, S. S., & Wirawan, A. B. (2022). Eksplorasi Pemodelan Gedung Dekanat Fakultas Teknik Universitas Negeri Semarang Menggunakan Software Autodesk Revit. Dinamika Teknik Sipil, 15(1). https://doi.org/10.23917/dts.v1i1.17857. DOI: https://doi.org/10.23917/dts.v1i1.17857
Ramadhan, M. A., & Maulana, A. (2020). Pemahaman Konsep BIM melalui Autodesk Revit bagi Guru SMK Teknik Bangunan se-Jabodetabek. Wikrama Parahita : Jurnal Pengabdian Masyarakat, 4(1). https://doi.org/10.30656/jpmwp.v4i1.1886. DOI: https://doi.org/10.30656/jpmwp.v4i1.1886
Rizqy, R. M., Martina, N., & Purwanto, H. (2021). Perbandingan Metode Konvensional Dengan Bim Terhadap Efisiensi Biaya, Mutu, Waktu. Construction and Material Journal, 3(1). https://doi.org/10.32722/cmj.v3i1.3506. DOI: https://doi.org/10.32722/cmj.v3i1.3506
Rosmyanto, D. (2022). Analisis Biaya Pekerjaan Ulang Konstruksi Berdasarkan Data Evaluasi Desain Dengan Sistem Building Information Modeling. Satu Indonesia, 13(2). https://doi.org/10.52453/t.v13i2.425. DOI: https://doi.org/10.52453/t.v13i2.425
Saputra, M. P. A., Hasbullah, E. S., & Sukono, F. (2020). Estimasi Potensi Klaim Maksimal Dalam Risiko Kerugian Kebakaran Rumah Dengan Metode Extreme Value Theory (Evt) Di Kota Bandung. KUBIK; Jurnal Publikasi Ilmiah Dan Matematika, 5(2). https://doi.org/10.15575/kubik.v5i2.7445. DOI: https://doi.org/10.15575/kubik.v5i2.7445
Setiami, R., & Maulana, A. (2021). Pengembangan E-Modul Pada Mata Kuliah Menggambar Teknik Dengan Aplikasi Permodelan Bangunan Sistem BIM. Jurnal Pensil : Pendidikan Teknik Sipil, 10(1). https://doi.org/10.21009/jpensil.v10i1.17013. DOI: https://doi.org/10.21009/jpensil.v10i1.17013
Suasira, I. W., Tapayasa, I. M., & Santiana, I. M. A. (2021). Analisis Komparasi Metode Building Information Modeling (Bim) Dan Metode Konvensional Pada Perhitungan Rab Struktur Proyek (Studi Kasus Pembangunan Pasar Desa Adat Pecatu). Jurnal Teknik Gradien, 13(1). https://doi.org/10.47329/teknikgradien.v13i1.737.
Troncoso-Pastoriza, F., López-Gómez, J., & Lara, F.-G. (2018). Generalized Vision-Based Detection, Identification and Pose Estimation of Lamps for BIM Integration. MPDI, 18(7). https://doi.org/10.3390/s18072364. DOI: https://doi.org/10.3390/s18072364
Umam, F. N., Erizal, E., & Putra, H. (2022). Peningkatan Efisiensi Biaya Pembangunan Gedung Bertingkat Dengan Aplikasi Building Information Modeling (BIM) 5D. Teras Jurnal: Jurnal Teknik Sipil, 12(1). https://doi.org/10.29103/tj.v12i1.704. DOI: https://doi.org/10.29103/tj.v12i1.704
Zahro, P. K., Ratnaningsih, A., & Hasanuddin, A. (2021). Evaluasi Perancangan Anggaran Biaya Dan Waktu Menggunakan Metode Bim. Teras Jurnal: Jurnal Teknik Sipil, 11(2). https://doi.org/10.29103/tj.v11i2.529. DOI: https://doi.org/10.29103/tj.v11i2.529