Utilization of the Time Driven Activity Based Costing Method in Determining the Cost of Room Rent at Hotel Tampiarto Probolinggo

Authors

  • Tatik Amani Panca Marga University
  • Khusnik Hudzafidah Panca Marga University
  • Hanifah Indah Wulandari Panca Marga University

DOI:

https://doi.org/10.23887/ijssb.v5i4.40070

Keywords:

Costing, time driven activity based costing, hotel

Abstract

The determination of the cost of renting a room at the Hotel Tampiarto Probolinggo is currently still using traditional methods that lack accuracy. Time driven activity-based costing method can solve these problems by presenting an accurate cost of room rental. This study aims to calculate and present hotel room rental prices with the time driven activity-based costing method and to find out the difference between the traditional method and the time driven activity-based costing method. The method in this research is descriptive qualitative with a case study approach. The subject of this study is the rental price of all rooms at Hotel Tampiarto Probolinggo. The results of calculations and analysis in this study indicate that the calculation of the cost of renting a hotel room with the Time Driven Activity Based Costing method can be applied by Hotel Tampiarto because the results show that the allocation of costs for each activity based on the time required produces a more accurate and efficient cost of renting a room with the average efficiency rate of each room is 8% to 30% of the current price of traditional methods.With the cost of goods using the time driven activity based costing method, management can make business strategies to increase room rental income by making new strategies, especially for the type of room with the lowest sales level with cheaper room rental costs.

References

Azmi, Z. (2018). Time Driven Activity Based Costing dan Implementasinya Pada Jasa Perawatan Kesehatan. Jurnal Akuntansi & Ekonomika, V0l. 8 N0 1. https://doi.org/10.37859/jae.v11i1.1534.

Baihaqi, L. A., Mas, I., & Sayekti, Y. (2018). Analisis Penentuan Beban Pokok Produksi Pada Usaha Tempe Sumber Mas Jember Analysis Determination Cost of Production on Businesses Tempe Sumber Mas Jember. E-Journal Ekonomi Bisnis Dan Akuntansi, V(70), 134–140. https://doi.org/10.19184/ejeba.v5i2.8648.

Bayangkara, I. (2019). Implementasi Time Driven Activity ABC (TDABC) dalam Perhitungan Harga Pokok Produksi AMDK Merk “RIO.” Jurnal Ekonomi Akuntansi, 4(1), 99–117. https://doi.org/10.30996/jea17.v4i01.3291.

Danang Rahmaji. (2013). Penerapan Activity-Based Costing System Untuk Menentukan Harga Pokok Produksi PT.Celebes Mina Pratama. EMBA, 1(3), 63–73. https://doi.org/10.35794/emba.1.3.2013.1940.

Devine, M. (2016). Penerapan Metode Time Driven Activity-Based Costing Untuk Menghitung Harga Pokok Produk Jasa : Studi Kasus Salon Kecantikan AVV Make Up & Hard DO. Jurnal Akuntansi, 9(2), 130–146. https://doi.org/10.25170/jara.v9i2.23.

Dewi, T. U., & Agustia, D. (2014). Desain Model Time Driven Activity Based Costing Dalam Menentukan Unit Cost Tarif Kamar Instalasi Merpati RSUD dr. Soedono Madiun. Ekonomi Dan Bisnis, 3, 228–234. http://dx.doi.org/10.20473/jeba.V24I32014.228-234.

Feny Triagustina, & Gani, L. (2021). Usulan Time-Driven Activity Based Costing System, Customer Profitability Analysis dan Sistem Pengendalian Internal pada Perusahaan Logistik. Jurnal Riset Akuntansi & Perpajakan (JRAP), 8(01), 1–13. https://doi.org/10.35838/jrap.2021.008.01.01.

Hariyati. (2018). Time Driven Activity-Based Costing : Konsep Akuntansi Manajemen yang Akurat dalam Menghadapi Lingkungan yang Dinamis dan Bisnis Global. Jurnal Bisnis Dan Manajemen, 3(2), 218–230. https://doi.org/10.26740/bisma.v3n2.p218-230.

Hartono, E. M. (2021). Analisis Cost-to-Serve dan customer Profitabilitas dengan Time-Driven Activity-Based Costing. Jurnal Akuntansi, 8(1), 21–33. http://dx.doi.org/10.31000/competitive.v5i1.2589.

Indira Kristina, L. J. F. (2016). Penerapan Time-Driven Activity Based Costing Pada Perhitungan Harga Pokok Produk Jasa di PR Ernest Advisory. Jurnal Akuntansi, 1, 41–51. https://doi.org/10.25170/jara.v10i1.39.

Jovanka, A. A., & Faliany, L. J. (2017). Penerapan Time-Driven Activity-Based Costing Pada Perhitungan Harga Pokok Produk Usaha Jasa Unixon. Jurnal Akuntansi, 11(1), 12–31. https://doi.org/10.25170/jara.v11i1.49.

Juanelo Ryan, L. J. F. (2018). Penerapan Time-Driven Activity Based Costing Pada Perhitungan Harga Pokok Kamar Penginapan Pondok Impian. BALANCE, 15(1), 74–89. https://doi.org/10.25170/balance.v18i1.

Kamaliah, Z. R. N. S. (2018). Analisis Biaya Dengan Menggunakan Syistem Time Driven Aktivity Based Costing (TDABC) Sebagai Dasar Penentuan Biaya Per Mahasiswa (Unit Cost) : Studi Kasus Universitas Pasir Pengarain. Paper Knowledge . Toward a Media History of Documents, 26(September), 12–26. http://dx.doi.org/10.31258/je.26.3.p.65-83.

Kaukab, M. E. (2019). Implementasi Activity-Based Costing Pada UMKM. Journal of Economic, Management, Accounting and Technology, 2(1), 69–78.. https://doi.org/10.32500/jematech.v2i1.576.

Kaunang, B., Walandouw, S. K., Akuntansi, J., Sam, U., & Manado, R. (2015). Penerapan Metode Activity Based Costing System Dalam Menentukan Besarnya Tarif Jasa Rawat Inap Pada Rumah Sakit Umum Bethesda. 3(1), 1214–1221. https://doi.org/10.35794/emba.3.1.2015.8125.

Kurniawansyah, D. (2020). Kinerja Umkm Di Kabupaten Jember : Studi Empiris Sebelum Dan Sesudh Penerapan Metode Time-Driven Activity-Based Costing. Jurnal Riset Akuntansi Dan Bisnis Airlangga, 5(1), 834. https://doi.org/10.31093/jraba.v5i1.207.

Mira Ely, Rochman Effendi, I. M. (2019). Penerapan Metode Time Driven Activity Based Costing (TDABC) dalam Perhitungan Kos Service pada Bengkel HBBA. Jurnal Akuntansi Universitas Jember, 17(2), 82–91. https://doi.org/10.19184/jauj.v17i2.10709.

Oktavia, D., Studi, P., Fakultas, A., & Jember, U. (2017). Implementasi time driven activity based costing ( tdabc ) pada usaha kecil menengah (ukm) tape handayani 82 bondowoso. Jurnal Akuntansi Universitas Jember, 1–19. https://doi.org/10.19184/jauj.v11i2.1262.

Ramintang, J., & Pangemanan, S. (2016). The Application of Activity-Based Costing (ABC) and Job-Order Costing (JOC) at Wisata Bahari Restaurant Manado. Jurnal EMBA : Jurnal Riset Ekonomi, Manajemen, Bisnis Dan Akuntansi, 4(1), 1–10. https://doi.org/10.35794/emba.4.1.2016.11559.

Riediansyaf, Mertzha Dwiputri; Basuki, B. (2014). The Application of Time-Driven Activity-Based Costing In the Hospitality Industry: An Exploratory Case Study. Journal of Applied Management Accounting Research, 12(1), 27–54. https://cmaaustralia.edu.au/ontarget/wp-content/uploads/2014/06/JAMARv12.1-TDABC-in-Hospitality-Industry.pdf.

Rotikan, G. S. (2013). Penerapan Metode Activity Based Costing dalam Penentuan Harga Produksi pada PT Tropica Cocoprima. Jurnal EMBA, 1(3), 1019–1029. https://doi.org/10.35794/emba.1.3.2013.2307.

Satria, H. (2017). Penerapan Metode Activity Based Costing Untuk Menentukan Harga Pokok Produksi. Jurnal Benefita, 2(2), 92–101. https://doi.org/10.22216/jbe.v2i2.1265.

Suratinoyo, A. (2013). Penerapan Sistem Abc Untuk Penentuan Harga Pokok Produksi Pada Bangun Wenang Beverage. Jurnal Riset Ekonomi, Manajemen, Bisnis Dan Akuntansi, 1(3), 658–668. https://doi.org/10.35794/emba.v1i3.2134.

Tandiontong, M. (2011). Peranan Activity-Based Costing System Dalam Perhitungan Harga Pokok Terhadap Peningkatan Profitabilitas Perusahaan (Studi Kasus PT Retno Muda Pelumas Prima Tegal). Jurnal Ilmiah Akuntansi, 2(5). https://media.neliti.com/media/publications/220294-peranan-activity-based-costing-system-da.pdf.

Th.A.Sumilat, Z. (2013). Penentuan Harga Pokok Penjualan Kamar Menggunakan Activity Based Costing Pada RSU Pancaran Kasih GMIM. Jurnal EMBA, 1(3), 454–464. https://doi.org/10.35794/emba.1.3.2013.2060.

Winarno, Eko Nugroho, I. H. (2014). Sistem Pendukung Keputusan Uang Kuliah Tunggal Dengan Metode Activity Based Costing. Jurnal Akuntansi Dan Bisnis, 14(2), 108–114. http://dx.doi.org/10.20961/jab.v14i2.156.

Downloads

Published

2021-12-29

How to Cite

Amani, T., Hudzafidah, K., & Wulandari, H. I. (2021). Utilization of the Time Driven Activity Based Costing Method in Determining the Cost of Room Rent at Hotel Tampiarto Probolinggo. International Journal of Social Science and Business, 5(4), 543–550. https://doi.org/10.23887/ijssb.v5i4.40070

Issue

Section

Articles